Structural Steel Detailing for Fabricators

Tectonix provides structural steel detailing for fabricators. Typical work includes Tekla 3D modeling, shop and erection drawings, anchor bolt plans, and connection development based on the Engineer of Record's design intent. A U.S.-based project manager coordinates scope, RFIs, revisions, and delivery.

What's Included

Inside a Structural Scope

Complete shop and erection drawing packages for primary structural steel — columns, beams, bracing, trusses, and connections — produced in Tekla Structures to AISC standards.

Shop Drawings

Piece mark drawings, assembly drawings, and fitting details with every weld, bolt, and dimension accounted for down to 1/16th of an inch.

Erection Drawings

Framing plans, elevations, column schedules, and connection sequencing drawings that give erectors everything they need in the field.

Anchor Bolt Plans

Anchor bolt setting plans and base plate details coordinated with the foundation contractor and equipment vendors before concrete pours.

Connection Development

Practical, fabrication-friendly connections developed from the Engineer of Record's design loads and intent — prioritizing shop efficiency and ease of erection.

ABM extracted directly from the Tekla model for early mill orders, so you can lock in material pricing before drawings are complete.

RFI & Revision Management

A live revision log on every project. Your U.S. project manager batches RFI responses and tracks every drawing's status through the submittal cycle.

Deliverables

Deliverable Format Matrix

Exactly what lands in your inbox, in what format, and what your shop uses it for.

DeliverableFormatUsed For
Shop drawingsPDF, DWGShop floor fabrication and submittal review
Erection drawingsPDF, DWGField erection planning and sequencing
Anchor bolt plansPDF, DWGFoundation coordination and concrete embeds
CNC / DSTV filesNC1, DSTV, DXF, XMLDrill lines, beam processors, plate tables
Advanced bill of materialXLS, CSV, KISSEarly mill orders and material procurement
Tekla 3D modelNative .db1, IFCBIM coordination and clash detection

Typical Project Timeline

How a Structural Engagement Runs

Durations vary with project size and document completeness — we confirm a project-specific schedule during your free scope review.

1
2–3 days

Scope Review & Kickoff

Free scope review of your IFC documents, project-specific schedule, and kickoff call with your assigned U.S. project manager.

2
2–4 weeks

Model Development

Full Tekla Structures model built from contract documents, with connection development submitted for EOR approval in parallel.

3
2–6 weeks

Drawing Extraction & QA

Shop and erection drawings extracted, run through our 100% internal QA/QC check, and released in sequenced packages matched to your fabrication schedule.

4
Ongoing

Submittal & Revision Cycle

Approval drawings managed through the submittal cycle. RFIs and EOR revisions are batched into revision sets with impact flagged before they hit your shop.

Structural Steel Detailing FAQ

What is NC1 scribing (DSTV part marking) in steel fabrication?

An NC1 scribing file carries part marks, layout lines, and piece IDs from the steel detailing model into a machine-readable format. CNC equipment, including beam lines, reads the file to mark members during processing. The exact marks and machine behavior depend on the detailing output and the fabricator’s equipment and settings.

What belongs on a constructability review checklist for structural steel?

A constructability review checklist for structural steel checks whether the design can be detailed, fabricated, shipped, and erected as planned. Review connection feasibility, erection sequence, clearances, tolerances, open RFIs, and drawing revisions. It helps teams flag questions to resolve before downstream work; project requirements vary.

CNC / NC Files for Steel: DSTV and NC1 Explained

CNC / NC files for steel carry member geometry and machining instructions from a detailing model to compatible fabrication equipment. DSTV is a commonly used exchange format, and NC1 is a common file extension for these steel-member files. Supported operations depend on the export settings, machine and controller, so files must be checked against the approved drawings before production.

What is steel detailing and why does a fabricator need it?

Steel detailing is the process of producing fabrication-ready drawings and models from an engineer's design documents. A fabricator needs it because general design drawings lack the precision required to actually cut, drill, and assemble steel members — piece marks, hole locations, weld symbols, and BOM are all products of detailing.

Need Structural Steel Detailing on Your Next Project?

Send us your plans and specs. A U.S. project manager will review your scope and respond within 24–48 business hours — at no cost.